page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132 page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
page 145
page 146
page 147
page 148
page 149
page 150
page 151
page 152
page 153
page 154
page 155
page 156
page 157
page 158
page 159
page 160
page 161
page 162
page 163
page 164
page 165
page 166
page 167
page 168
page 169
page 170
page 171
page 172
page 173
page 174
page 175
page 176
page 177
page 178
page 179
page 180
page 181
page 182
page 183
page 184
page 185
< prev - next > Energy Hydro power civil_works_guidelines_for_micro_hydro (Printable PDF)
130 CIVIL WORKS GUIDELINES FOR MICRO-HYDROPOWER IN NEPAL
9.3 Bio-engineering works
All engineering measures such as retaining walls and check
dams should be well supplemented with bio-engineering
measures as far as practicable.
Planting grass or shrubs on the freshly cut hill or the landslide
area are examples of bio-engineering measures. Fast growing,
deep rooted and dense cover type of vegetation that is appropriate
to the local environment should be used for such purposes.
Only deep-rooted trees should be used for bio-engineering
purposes, and they should not be planted so close to canals or
structures that their roots could cause piping or structural damage.
At least 3 metres clearance is recommended. Fast growing trees
that do not have intense root systems should be avoided since
they may fall due to their own weight during storms.
Once the slopes have been stabilised, care should be taken to
ensure that there is no further overgrazing.
9.4 Retaining structures
Retaining walls are structures that support the backfill and
surcharge load from the additional canal width or platform
over the walls in hill sections. Though the per metre cost of
canal construction requiring retaining walls is more than
constructing the same length by cutting inside the hill, the
use of retaining walls sometimes becomes essential.
The most common types of retaining wall used in micro-hydro
schemes are gravity walls of gabions or cement masonry. These
depend on the mass of the structure to resist overturning.
Their design depends on the wall density, soil parameters,
drainage and loading conditions, typically resulting in a base
width of 0.40 to 0.65 times the height. The designs shown in
Figures 9.1 and 9.2 are therefore safe, but conservative in
many conditions.
For high or long walls it will be economical to design for the
specific site conditions. Site specific designs should also be
made where the backfill is inclined rather than horizontal.
The walls should be checked for overturning, sliding and
bearing pressure, as described for anchor blocks in Chapter 7.
Alternatively refer to standard civil engineering texts such as
Ref. 7. (The unit weight of filled gabions is 14-18 kN/m3,
depending on the unit weight of the rock fill and assuming
30-35% voids).
Wall foundations must be deep enough to be safe against
erosion: normally at least 0.5 m below ground level, but
see Section 3.8 for river works. Lined toe drains may be
Photo 9.2 Masonry steps for energy dissipation and control of
spillway water. Although costly, elaborate control is essential
where slopes are vulnerable to erosion (Siklis)
used in erodible areas to carry seepage water safely away
from the wall foundation.
Gabion retaining walls should be constructed with an
inclination of 10%, see Figure 9.1. Where gabions are to be
built on sand or fine soils, a layer of filter cloth should be
placed between the foundation and the gabions. The gabion
boxes should be laced together along all edges and stretched
before filling with rock. The rock should be packed with the
minimum of voids.
Stone masonry walls can be constructed in 1:4 cement/ sand
mortar as shown in Figure 9.2. Such walls are suitable for
retained heights of up to 2 to 3 m. The slope of the front face
may be steepened if necessary, provided that the base width
is maintained. The rear face of the wall should be left rough
to increase friction with the backfill. Weepholes must be
provided to relieve water pressure behind the wall, and their
mouths should be protected with carefully placed stones.
Backfill behind the wall should be freedraining gravel or stones;
if the retained soil is fine, a filter cloth should be placed as
shown to prevent the soil particles blocking the drainage.